Advanced Natural Gas Combined Cycle Power Plant
Electricity Production Costs Report | Issue D | Q4 2024
Report Details |
3,500 GWh/y United States-based plant | Q4 2024 | 107 pages |
This report presents a cost analysis of a 3,500 GWh/y (GWh per year) United States-based plant. You can add a customized cost analysis, assuming another location (country), when ordering a premium edition of this report.
Report Abstract
This study also provides a techno-economic analysis about Electricity generation from natural gas in the USA. In this study, high efficiency H-class combustion turbines (CT) supplemented with heat recovery steam generators (HRSG) and steam turbines (ST) are employed to Electricity generation.
The report provides a comprehensive study of Electricity production and related Electricity production cost, covering three key aspects: a complete description of the Electricity production process examined; an in-depth analysis of the related Electricity plant capital cost (Capex); and an evaluation of the respective Electricity plant operating costs (Opex).
The Electricity production process description includes a block flow diagram (BFD), an overview of the industrial site installations, detailing both the process unit and the necessary infrastructure, process consumption figures and comprehensive process flow diagrams (PFD). The Electricity plant capital cost analysis breaks down the Capex by plant cost (i.e., ISBL, OSBL and Contingency); owner's cost; working capital; and costs incurred during industrial plant commissioning and start-up. The Electricity plant operating costs analysis covers operating expenses, including variable costs like raw materials and utilities, and fixed costs such as maintenance, labor, and depreciation.
Process Schematic

The process under analysis comprises two thermodynamic cycles: (1) Brayton Cycle; and (2) Rankine Cycle.
Brayton Cycle. In the Brayton cycle, first air is compressed and mixed with natural gas in a mixing chamber. The mixture is then ignited in an expansion cylinder and energy is released. High pressure hot gas from combustion expands through a turbine, spinning rotating blades connected to a shaft, thus generating power. In the case of the process approached in this report, the shaft is connected to a generator of electricity.
Rankine Cycle. The waste heat from the gas turbine exhaust is used in a boiler to evaporate high pressure water, forming high pressure dry saturated steam, which expands through a steam turbine, generating electricity. The steam expansion decreases its temperature and pressure, which may cause some condensation. The wet low pressure steam is then condensed at a constant pressure to become saturated water that will be reused in the cycle. This thermodynamic cycle is called Rankine Cycle.
The use of the heat released in the Brayton Cycle as energy to generate the high pressure steam in the Rankine Cycle increases the total energy extracted from the natural gas. This entire process is also called Brayton-Rankine combined cycle.
Up-to-date PDF Report
Professional report based on Q4 2024 economic data, ensuring timely evaluations.
Multiple Use Cases
Ideal for investment screening, feasibility studies, cost estimates, and research planning.
Proven Methodology
Developed using a consistent methodology honed over a decade, ensuring reliable cost analyses.
Compact
$0 USD
Production Process Information
Process Consumptions
Labor Requirements
Plant Capital Cost Summary
Operating Cost Summary
Production Costs Datasheet
Pages | Tables | Images
Read-only Online PDF Format
Updated with Q4 2024 Data
DETAILED
$0 USD
Production Process Information
Process Consumptions
Labor Requirements
Plant Capital Cost Summary
Operating Cost Summary
Production Costs Datasheet
Plant Capital Cost Details
Operating Cost Details
Pages | Tables | Images
Downloadable PDF Format
Updated with Q4 2024 Data
PREMIUM
MOST POPULAR
$0 USD
Production Process Information
Process Consumptions
Labor Requirements
Plant Capital Cost Summary
Operating Cost Summary
Production Costs Datasheet
Plant Capital Cost Details
Operating Cost Details
Plant Cost Breakdowns
Plant Capacity Assessment
Process Flow Diagrams
Costs in Different Countries Add-on
Pages | Tables | Images
Print-enabled PDF Format Add-on
Updated with Q4 2024 Data
Share with Co-workers
Technical Support via Email
Content Highlights
Plant Capital Cost Summary
Summary outlining the capital cost required for building the Electricity production plant examined
Plant Capital Cost Details
Detailing of fixed capital (ISBL, OSBL & Owner’s Cost), working capital and additional capital requirements
Plant Cost Breakdowns
Breakdown of Electricity process unit (ISBL) costs and infrastructure (OSBL) costs; plant cost breakdown per discipline
Operating Costs Summary
Summary presenting the operating variable costs and the total operating cost of the Electricity production plant studied
Operating Cost Details
Detailing of utilities costs, operating fixed costs and depreciation
Plant Capacity Assessment
Comparative analysis of capital investment and operating costs for different Electricity plant capacities
Production Process Information
Block Flow Diagram, descriptions of process unit (ISBL) and site infrastructure (OSBL)
Process Consumptions
Raw materials and utilities consumption figures, by-products credits, labor requirements
Process Diagrams
Process flow diagrams (PFD), equipment list and industrial site configuration
Other Electricity Production Cost Reports
Integrated Gasification Combined Cycle Power Plant
In this report, the process reviewed is an integrated gasification combined cycle (IGCC) for Electricity generation from coal. In this process, coal is gasified and the resulting syngas is used as fuel in a combined cycle power plant. The economic analysis is based on a plant located in the USA.
Details: 5,200 GWh/y United States-based plant | Q4 2024 | 107 pages | Issue H From $0 USD
The cost analyses presented in this report target a 5,200 GWh/y (GWh per year per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.
Power Generation from Wood via Biomass Combined Cycle
It presents the economics of Electricity generation from wood in the USA via a gasification process. In the process examined, wood feedstock is converted to syngas via a gasification step, and the syngas is used as fuel to Electricity generation via a traditional combined-cycle.
Details: 180 GWh/y United States-based plant | Q4 2024 | 107 pages | Issue J From $0 USD
The cost analyses presented in this report target a 180 GWh/y (GWh per year per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.
Could Not Find the Report You Need?
Obtain a Bespoke Report
Get a report targeting the process in which you are interested
See Offer Details
Understand Bespoke Reports and how you can easily order them
Check Editions & Pricing
Complete a brief form and see a quotation for your Bespoke Report
Other Related Production Cost Reports
Ethylene Glycol Production from Carbon Dioxide
This study presents the economics of Monoethylene Glycol (MEG) production from carbon dioxide (CO2) in the United States using an electrochemical process similar to Liquid Light process. Initially, CO2 is electrochemically reduced and acidified into oxalic acid. Then, oxalic acid is esterified with methanol producing dimethyl oxalate, which is hydrogenated forming MEG.
Details: 150 kta United States-based plant | Q4 2024 | 107 pages | Issue C From $799 USD
The cost analyses presented in this report target a 150 kta (kilo metric ton per annum per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.
Chlorine Production from Sodium Chloride (Membrane Process)
This study presents the economics of Chlorine production from sodium chloride via a membrane process plant located in the United States. In the process under analysis, an aqueous solution of sodium chloride (brine) is decomposed electrolytically in a membrane cell, producing Chlorine, sodium hydroxide and hydrogen.
Details: 500 kta United States-based plant | Q4 2024 | 107 pages | Issue A From $799 USD
The cost analyses presented in this report target a 500 kta (kilo metric ton per annum per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.
+800 Reports Developed, Targeting +250 Commodities
Best-in-Class Reports
Analysis of capital and operating costs of commodity production processes. Prices starting at $799 USD
Vast Report Library
858 independent and up-to-date reports examining embryonic and established production processes
Free Sample Reports
Quickly understand the structure and depth of content of our professional reports