Production Cost Report
ICC - Is Bespoken: 0
ICC - Main References: ?
ICC - Issue: A
ICC - Volume: 110
ICC - Report ID: 110-A
ICC - Report Location: United States
ICC - Is Popular: 0
ICC - Is Developed: 1
ICC - Title: Sodium Hydroxide Production from Sodium Chloride (Membrane Process)
ICC - Show Overview: 1
ICC - Report Location ID: 1
ICC - Plant Capacity Unit ID: 14
ICC - Volume Reports List: 110-B,110-D,110-E,110-F,110-C
ICC - Related Reports List: 852-C,326-A,293-A,852-D
ICC - Report Location Code: USA
ICC - Delivery Times: {"versions":{"1":{"1":{"time":"5","price":0},"2":{"time":"1","price":"299"}},"2":{"1":{"time":"5","price":0},"2":{"time":"1","price":"299"}},"3":{"1":{"time":"7","price":0},"2":{"time":"3","price":"299"}}},"unit":"d"}
ICC - Prices: {"versions":{"1":{"1":"799","2":"799","3":"799"},"2":{"1":"1599","2":"1599","3":"1599"},"3":{"1":"2699","2":"2699","3":"2699"}},"currency":"USD"}
ICC - Plant Capacity Unit Name: kilo metric ton per annum
ICC - Plant Capacity Unit Short Name: kta
ICC - Process Overview Image: //cdn.intratec.us/images/icc/process-overview/110-A.jpg
ICC - Process Overview Text: <h6>Products</h6> <p><b>Caustic Soda</b></p>, <p><b>Hydrogen</b></p>, <p><b>Chlorine</b></p> <h6>Raw Materials</h6> <p><b>Electricity</b></p>, <p><b>Chemicals</b></p>, <p><b>Sodium Chloride</b></p>, <p><b>Sulfuric Acid</b></p>, <p><b>HCl</b></p>
ICC - Process Schematic Image: //cdn.intratec.us/images/icc/process-schematics/110-A.jpg
ICC - Process Schematic Text: <p>The process under analysis comprises three major sections: (1) Brine purification; (2) Electrolysis; and (3) Products Recovery.</p><p>Brine purification. Initially, recycled depleted brine is mixed with water and resaturated with fresh NaCl salt (sodium chloride). Heavy metal ions (e.g. Ca2+ and Mg2+) present in the brine would be harmful to the membranes. So the brine is treated with precipitants, in such a way the heavy metals precipitate forming a sludge, which is removed by settling in a clarifier. Subsequently, the clarified brine is filtered and then purified by ion exchange resins to remove residual hardness and achieve acceptable levels. </p><p>Electrolysis. The ultrapure brine and electricity are the main inputs to the electrolysis area. The brine is fed into the anolyte compartments of the cells, separated from the catholyte by cation-exchange membranes. Chlorine gas is generated at the anodes and sodium ions migrate through the membranes into the catholytes. The depleted brine from the anode compartments is dechlorinated downstream and then returned to brine saturation. On the catholyte side, water is electrolyzed generating hydrogen gas and hydroxyl ions. The membranes prevent the migration of such hydroxyl ions into the anolytes, in such a way that hydroxyl ions combine with the sodium ions forming caustic soda. The addition of demineralized water keeps the catholytes concentration at the desired level.</p><p>Products recovery. Hydrogen from electrolysis is compressed and directed to consumers. The caustic soda solution is concentrated to a saturated 50% NaOH solution – the commercialized form. The chlorine gas produced is sent to a drying system, consisting of drying towers where concentrated sulfuric acid circulates as dehydrating agent. The dry chlorine gas is compressed and then liquefied before being sent to storage.</p>
ICC - Short Description: This report presents the economics of Sodium Hydroxide production from sodium chloride in the United States, via a typical membrane process. In this process, sodium chloride is decomposed electrolytically, producing sodium hydroxide. Chlorine and hydrogen are generated as by-products in the process.
ICC - Main Product: Caustic Soda
ICC - Plant Capacity: 550.00
{"versions":{"1":"80","2":"90","3":"107"}}
ICC - Images Count: {"versions":{"1":"9","2":"13","3":"22"}}
ICC - Table Count: {"versions":{"1":"22","2":"28","3":"34"}}

Sodium Hydroxide Production from Sodium Chloride (Membrane Process)

Caustic Soda Production Costs Report | Issue A | Q4 2024

Production Cost Report

See Preview

See Editions

Starting at $799 USD

Report Details
550 kta United States-based plant   |   Q4 2024   |   107 pages

This report presents a cost analysis of a 550 kta (kilo metric ton per annum) United States-based plant. You can add a customized cost analysis, assuming another location (country), when ordering a premium edition of this report.

Up-to-date PDF Report

Professional report based on Q4 2024 economic data, ensuring timely evaluations.

Multiple Use Cases

Ideal for investment screening, feasibility studies, cost estimates, and research planning.

Proven Methodology

Developed using a consistent methodology honed over a decade, ensuring reliable cost analyses.

Report Editions
 

Compact

 

$799 USD


Production Process Information

Process Consumptions

Labor Requirements

Plant Capital Cost Summary

Operating Cost Summary

Production Costs Datasheet

See All Features


  Pages | Tables | Images

 Read-only Online PDF Format

 Updated with Q4 2024 Data

 

 

 

DETAILED

 

$1,599 USD


Production Process Information

Process Consumptions

Labor Requirements

Plant Capital Cost Summary

Operating Cost Summary

Production Costs Datasheet

Plant Capital Cost Details

Operating Cost Details

See All Features


  Pages | Tables | Images

 Downloadable PDF Format

 Updated with Q4 2024 Data

 

 

 

PREMIUM

MOST POPULAR

$2,699 USD


Production Process Information

Process Consumptions

Labor Requirements

Plant Capital Cost Summary

Operating Cost Summary

Production Costs Datasheet

Plant Capital Cost Details

Operating Cost Details

Plant Cost Breakdowns

Plant Capacity Assessment

Process Flow Diagrams

Costs in Different Countries Add-on

See All Features


  Pages | Tables | Images

 Print-enabled PDF Format Add-on

 Updated with Q4 2024 Data

Share with Co-workers

Technical Support via Email

Content Highlights

Plant Capital Cost Summary

Summary outlining the capital cost required for building the Caustic Soda production plant examined

Plant Capital Cost Details

Detailing of fixed capital (ISBL, OSBL & Owner’s Cost), working capital and additional capital requirements

Plant Cost Breakdowns

Breakdown of Caustic Soda process unit (ISBL) costs and infrastructure (OSBL) costs; plant cost breakdown per discipline

Operating Costs Summary

Summary presenting the operating variable costs and the total operating cost of the Caustic Soda production plant studied

Operating Cost Details

Detailing of utilities costs, operating fixed costs and depreciation

Plant Capacity Assessment

Comparative analysis of capital investment and operating costs for different Caustic Soda plant capacities

Production Process Information

Block Flow Diagram, descriptions of process unit (ISBL) and site infrastructure (OSBL)

Process Consumptions

Raw materials and utilities consumption figures, by-products credits, labor requirements

Process Diagrams

Process flow diagrams (PFD), equipment list and industrial site configuration

Other Caustic Soda Production Cost Reports

Sodium Hydroxide Production from Sodium Chloride (Diaphragm Process)

It presents the economics of Sodium Hydroxide production from brine in the United States. The process examined in this report is a typical diaphragm process. Chlorine and hydrogen are also generated as by-products in the process.

Details: 600 kta United States-based plant   |   Q4 2024   |   107 pages   |   Issue B   From $799 USD

The cost analyses presented in this report target a 600 kta (kilo metric ton per annum per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.

Sodium Hydroxide Production from Sodium Chloride (Mercury Process)

This report analyses the economics of Sodium Hydroxide production from brine in Germany, via a typical mercury cell process. In this process, sodium chloride is decomposed electrolytically, producing sodium hydroxide. Chlorine and hydrogen are generated as by-products in the process.

Details: 220 kta Germany-based plant   |   Q4 2024   |   107 pages   |   Issue C   From $799 USD

The cost analyses presented in this report target a 220 kta (kilo metric ton per annum per annum) Germany-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.

Could Not Find the Report You Need?

Obtain a Bespoke Report

Get a report targeting the process in which you are interested

See Offer Details

Understand Bespoke Reports and how you can easily order them

Check Editions & Pricing

Complete a brief form and see a quotation for your Bespoke Report

Other Related Production Cost Reports

Nitrobenzene Production from Benzene (NORAM)

This report presents the economics of Nitrobenzene production from benzene and nitric acid in the United States. The process analyzed in this report is similar to NORAM's adiabatic benzene nitration process, which uses a plug-flow nitrator containing jet-impingement elements.

Details: 530 kta United States-based plant   |   Q4 2024   |   107 pages   |   Issue A   From $799 USD

The cost analyses presented in this report target a 530 kta (kilo metric ton per annum per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.

Aluminum Chloride Production

This report presents the economics of Aluminum Chloride production from aluminum metal and chlorine in the United States. In the process, chlorine gas is passed through molten aluminum, producing Anhydrous Aluminum Chloride.

Details: 10 kta United States-based plant   |   Q4 2024   |   107 pages   |   Issue A   From $799 USD

The cost analyses presented in this report target a 10 kta (kilo metric ton per annum per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.

Conventional Natural Gas Combined Cycle Power Plant

This report examines the costs associated to Electricity generation from natural gas in the USA via conventional natural gas combined cycle. In this process F-class combustion turbines (CT) supplemented with heat recovery steam generators (HRSG) and steam turbines (ST) are employed to Electricity generation.

Details: 5,200 GWh/y United States-based plant   |   Q4 2024   |   107 pages   |   Issue C   From $0 USD

The cost analyses presented in this report target a 5,200 GWh/y (GWh per year per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.

Advanced Natural Gas Combined Cycle Power Plant

This study also provides a techno-economic analysis about Electricity generation from natural gas in the USA. In this study, high efficiency H-class combustion turbines (CT) supplemented with heat recovery steam generators (HRSG) and steam turbines (ST) are employed to Electricity generation.

Details: 3,500 GWh/y United States-based plant   |   Q4 2024   |   107 pages   |   Issue D   From $0 USD

The cost analyses presented in this report target a 3,500 GWh/y (GWh per year per annum) United States-based plant. For those interested in cost analyses considering other plant capacities and/or locations, Intratec offers a customized analysis as an optional feature.

+800 Reports Developed, Targeting +250 Commodities

Best-in-Class Reports

Analysis of capital and operating costs of commodity production processes. Prices starting at $799 USD

Learn More

Vast Report Library

858 independent and up-to-date reports examining embryonic and established production processes

Browse Library

Free Sample Reports

Quickly understand the structure and depth of content of our professional reports

See Full Samples